NHPC Launches 240 MW Uri-I Stage II Hydel Project in J&K
October 10, 2026
  • Read Ecopy
  • Circulation
  • Advertise
  • Careers
  • About Us
  • Contact Us
Android AppiPhone AppArattai
Organiser
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • World Hindu Congress 2026
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • World Hindu Congress 2026
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
Organiser
  • Home
  • Bharat
  • World
  • Operation Sindoor
  • Editorial
  • Analysis
  • Opinion
  • Culture
  • Defence
  • International Edition
  • RSS @ 100
  • Magazine
  • Read Ecopy
Home Bharat

J&K eyes round-the-clock power supply: NHPC begins work on 240 MW Uri-I stage II project

Many hydropower projects on the Western Rivers, the Jhelum and the Chenab, have been fast tracked after putting the Indus Waters Treaty 1960 in abeyance and among them is Stage II project of Uri I. Collectively, these projects are expected to make Jammu and Kashmir a power surplus Union Territory (UT) in the coming years and provide relief to citizens by way of 24-hour supply of electricity

Sant Kumar SharmaSant Kumar Sharma
Jun 3, 2026, 08:30 am IST
inBharat, Jammu and Kashmir
Follow on Google News
NHPC CMD Bhupender Gupta inaugurated construction activities of the 240 MW Uri-I Stage-II Hydroelectric Project in Uri

NHPC CMD Bhupender Gupta inaugurated construction activities of the 240 MW Uri-I Stage-II Hydroelectric Project in Uri

Facebook
Twitter
WhatsAppTelegramEmail

JAMMU: Construction work on the 240 MW Uri-I Stage-II Hydroelectric Project has formally commenced with the successful execution of the first blast at Adit-3 in Mohura area of Uri in Baramulla district of Union Territory (UT) of J&K. It started literally with a big bang, a controlled blast carried out by NHPC experts regarding which the locals had been intimated in advance so as to not cause panic.

The inaugural blast was carried out in the presence of the Chairman and Managing Director of NHPC Bhupender Gupta, who officially launched the construction phase of the project. Senior NHPC officials based in Jammu, including Executive Director Anis Gouraha, were present on the occasion.

Being developed by NHPC on the Jhelum River, the Uri-I Stage-II project is an extension of the existing Uri-I Hydroelectric Project and is aimed at enhancing power generation capacity. This second unit, when operational, will help improve the power supply situation, particularly during winter months of lean flows in Jhelum.

Read More: Indian scientists embed nano-gold in ultra-thin films; Opening new frontiers in self-powered wearable technologies

Officials said the first blast marks the beginning of major underground works under the project, which is expected to significantly augment electricity generation and strengthen energy security in the region. At present, during the winter months, power needs to be purchased from the Northern Grid and this puts a burden on the exchequer.

Harnessing Power Potential of Jhelum River

The project will comprise two generating units of 120 MW each and is projected to generate nearly 932 million units of clean energy annually through an underground powerhouse. According to officials, the project forms part of wider efforts to harness J&K’s hydropower potential and reduce reliance on external sources of electricity. They said the commencement of construction marks a crucial milestone in the execution of the project, which is expected to make a substantial contribution towards meeting the region’s future power requirements.

Officials added that the Uri-I Stage-II Hydroelectric Project is also expected to bolster the Union Territory’s energy infrastructure and support sustainable power generation in the years ahead.

The project’s civil works were tendered in June last year. These works comprise the headrace tunnel, including adits, surge shaft, pressure shaft/penstock, besides such others. The construction of civil works is expected to be completed within four years, and the commercial production of power may start in 2030.

This project is located downstream of NHPC’s existing 480 MW Uri-I run-of-river station. It will make use of Uri-I’s existing structures, such as the barrage, head regulator, and desilting arrangements. Uri-I Stage-II will include a 10.47 km long, 6.5 metre diameter headrace tunnel, a 42.8 metre high underground powerhouse and tailrace tunnel.

Dul Hasti Stage II Makes Progress

Incidentally, the tender for Dul Hasti, Stage II, project of 260 MW, located on the Chenab in Kishtwar district, was also issued in June last year. It needs to be emphasized here that these two projects were conceived and designed at a time when Indus Waters Treaty (IWT) 1960 was in force. Even when IWT was put in abeyance in April 2025, no changes in design etc were brought in.

The largest beneficiary, measured by any yardstick, of the IWT in abeyance so far has been the UT of J&K as many power projects have been fast tracked. Due to this, in the coming years, as early as 24 months or so, J&K may become a power surplus area of the country. This is likely to happen as 1,000 MW Pakal Dul project and 624 MW Kiru hydropower projects are racing towards completion.

Incidentally, J&K stands to gain a lot from these projects because NHPC follows a method in which allocates 13 (12+1) per cent free power to the state/UT wherein it sets up any power project. As such, J&K may get over 211 MW of free power once Pakal Dul and Kiru are completed.

Besides bringing in clean power, these projects also create a major revenue stream for J&K as it gets crores in water usage charges. Free power, coupled with money from NHPC on water usage charges, will help J&K in a major way as it is presently a revenue deficit UT which depends on the Centre for major grants in aid to run its affairs.

Topics: Indus Waters TreatyNHPCUri-I Stage-II Hydroelectric Project
Share
Tweet
SendShareSend
✮ Subscribe Organiser YouTube Channel. ✮
✮ Join Organiser's WhatsApp channel for Nationalist views beyond the news. ✮
Previous News

Tiananmen Square Massacre: When Tanks Met Students—The Night Communist China Crushed Its Democratic Hope!

Next News

Britain’s Grooming Gangs: Survivors demand justice as chilling testimonies shake UK’s Parliament

Related News

The Hague based Permanent Court of Arbitration

India rejects Pakistan-favouring Indus Treaty award, calls Hague-based arbitration body ‘illegally constituted’

Pew Research Centre’s 2026 survey highlights Bharat’s growing global goodwill and influence.

Bharat’s rising global stature wins worldwide goodwill, Pew Research Centre’s 2026 survey reveals

Permanent Representative of India to the United Nations Parvathaneni Harish speaks at United Nations Security Council session

India rejects Pakistan at UN: Links Indus Waters Treaty to cross-border terrorism, reaffirms J&K stand

Chenab Riverbank

J&K: Salal, Baglihar reservoirs to be de-silted in coming days, advisory issued for people living on banks

Xi builds, Sharif stays silent. The Indus tells the real story

Selective Outrage? China’s Indus Dam exposes Pakistan’s double standards on water security

‘Ancient Pakistan’ to ‘Children of the Indus’: Why Pakistan is rebranding its identity

Load More

Latest News

Lucknow’s Seva Jyoti Yatra Marks 25 Years of PM Modi’s Public Life

From Village to Global: Lucknow’s Seva Jyoti Yatra marks 25 years of PM Modi’s public life

Illegal Bangladeshi migrants detained at Kamakhya station in Assam

Assam: 57 illegal Bangladeshi migrants arrested at Kamakhya station; Infiltrators possessed forged Aadhaar & Voter ID

The ‘Kasab Playbook’? leaked CJP chats urge protesters to wear tilak & kalawa, plot to spark violence in Hindu name?

Representative Image

Chhattisgarh | Kanker Explosives Conspiracy Case: Two Maoists Jan Militia members sentenced to 10 years imprisonment

Karnataka govt’s Anjanadri Mandir takeover set aside by High Court; Vidyadasa Baba’s puja rights upheld

Bommai Kolu celebrates Hindu devotion and storytelling through traditional dolls handcrafted by generations of artisans

From Wood and Clay to Worship: The Hindu artisans keeping the centuries-old Bommai Kolu tradition alive

India issued a sharp warning to Pakistan & asserted that it will not bow to nuclear blackmail

India slams Pakistan at UN: ‘Will not bow to nuclear blackmail’; Warns against using nukes as instruments of statecraft

V.D. Satheeshan (Left) Adoor Prakash (RIght)

Keralam Congress rift deepens as CM Satheeshan rejects UDF convener Adoor Prakash’s allegations of unilateral decisions

CJP leaders Abhijeet Dipke, Saurav Das and Ashutosh Ranka detained at Delhi Airport

CJP’s Abhijeet Dipke, Saurav Das & Ashutosh Ranka detained ahead of unauthorised protest at Jantar Mantar

UAE probe examines Flydubai terrorist’s links to a Muslim Brotherhood-associated network in Australia.

UAE confirms Flydubai co-pilot planned 9/11-style attack on Israel; Probe finds Muslim Brotherhood links in Australia

Load More
  • Privacy
  • Terms
  • Cookie Policy
  • Refund and Cancellation
  • Delivery and Shipping

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies

  • Home
  • Search Organiser
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Africa
    • North America
    • South America
    • Europe
    • Australia
  • Editorial
  • Operation Sindoor
  • Opinion
  • Analysis
  • Defence
  • Culture
  • Sports
  • Business
  • RSS @ 100
  • Entertainment
  • More ..
    • Sci & Tech
    • Vocal4Local
    • Special Report
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Health
    • Politics
    • Law
    • Economy
    • Obituary
  • Subscribe Magazine
  • Read Ecopy
  • Advertise
  • Circulation
  • Careers
  • About Us
  • Contact Us
  • Policies & Terms
    • Privacy Policy
    • Cookie Policy
    • Refund and Cancellation
    • Terms of Use

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies