Ayodhya Ram Temple construction: work in full swing, foundation work expected to be completed by October: Mandir Trust
June 8, 2023
  • Circulation
  • Advertise
  • Careers
  • About Us
  • Contact Us
Organiser
  • ‌
  • Bharat
  • World
  • G20
  • Editorial
  • Analysis
  • Opinion
  • Sports
  • More
    • Defence
    • RSS in News
    • Azadi Ka Amrit Mahotsav
    • My States
    • Vocal4Local
    • Business
    • Special Report
    • Culture
    • Sci & Tech
    • Entertainment
    • Education
    • Books
    • Interviews
    • Travel
    • Health
    • Obituary
    • Podcast
SUBSCRIBE
No Result
View All Result
  • ‌
  • Bharat
  • World
  • G20
  • Editorial
  • Analysis
  • Opinion
  • Sports
  • More
    • Defence
    • RSS in News
    • Azadi Ka Amrit Mahotsav
    • My States
    • Vocal4Local
    • Business
    • Special Report
    • Culture
    • Sci & Tech
    • Entertainment
    • Education
    • Books
    • Interviews
    • Travel
    • Health
    • Obituary
    • Podcast
No Result
View All Result
Organiser
No Result
View All Result
  • Home
  • Bharat
  • World
  • G20
  • Editorial
  • Opinion
  • Analysis
  • Culture
  • Defence
  • RSS in News
  • My States
  • Vocal4Local
  • Subscribe
Home Bharat

Ayodhya Ram Temple construction: work in full swing, foundation work expected to be completed by October: Mandir Trust

WEB DESK by WEB DESK
Jun 1, 2021, 10:35 am IST
in Bharat
Share on FacebookShare on TwitterTelegramEmail

Ayodhya: Construction work on the Ram temple in Ayodhya is going on in full swing and a part of the construction is likely to be completed by October this year, said general secretary of Shri Ram Janmabhoomi Teerth Kshetra Champat Rai on Monday.

Rai referred to the work concerning the foundation of the temple.

“The work of temple construction is going on all 24 hours in two shifts of 12 hours each. About 1.2 lakh sq meters of the earth has been dug out. It takes 4-5 days to place a one-foot think layer and compact it with a roller. We expect to complete it in October. By the grace of Lord Ram, all the workers and engineers are healthy,” he said.

“Four layers have been placed one on top of the other which are 400-feet long and 300-feet wide. A layer is pressed with a roller and after that, the next layer is placed. We have to place 40-50 layers. This is called roller-compacted concrete,” he added.

Shri Ram Janmbhoomi Teerth Kshetra Trust has been entrusted with the task of Ram temple construction in Ayodhya.
“The Ram Temple will be built in about two-and-a-half acres and a wall will be built around it, which is called Parkota. Retaining walls will be built inside the ground to prevent the effects of floods. This work will be completed in three years and with this preparation, we are doing all the work,” Rai said.

In March this year, Rai had said the door-to-door collection drive for Ram temple construction in Ayodhya has stopped in view of the pandemic, but devotees who missed the contribution drive could still make their contributions through the trust website.

While addressing a press conference on March 8, Vishwa Hindu Parishad (VHP) national vice-president Rai said that Rajasthan has contributed the most in the Samarpan (donation) drive for the construction of Ram Mandir in Ayodhya.
On August 5, 2020, Prime Minister Narendra Modi performed Bhoomi Pujan at ‘Shree Ram Janmabhoomi Mandir’.

ShareTweetSendShareSend
Previous News

“Please kill us by a single swing of the machete”, says lady Journalist harassed by CPM

Next News

Privacy in Google Era?

Related News

Not Good for India-Canada relations: Jaishankar slams Trudeau Govt for tableau depicting Indira Gandhi’s assassination

Not Good for India-Canada relations: Jaishankar slams Trudeau Govt for tableau depicting Indira Gandhi’s assassination

Maharashtra: Violence in Kolhapur over WhatsApp messages glorifying Aurangzeb and Tipu Sultan

Maharashtra: Violence in Kolhapur over WhatsApp messages glorifying Aurangzeb and Tipu Sultan

Wrestlers halt protest till June 15 after meeting Anurag Thakur; WFI Elections to be held by June 30

Wrestlers halt protest till June 15 after meeting Anurag Thakur; WFI Elections to be held by June 30

9 Years of Modi Govt: Towards the Goal of Affordable & Accessible Healthcare

9 Years of Modi Govt: Towards the Goal of Affordable & Accessible Healthcare

Auto Draft

Over 100 eminent citizens support inclusion of Savarkar and removal of Iqbal from DU’s political science syllabus

Loka Kerala Sabha: Controversy over CM Vijayan New York event, Oppn claims up to Rs 85 lakh charge to sit close to CM

Loka Kerala Sabha: Controversy over CM Vijayan New York event, Oppn claims up to Rs 85 lakh charge to sit close to CM

Comments

The comments posted here/below/in the given space are not on behalf of Organiser. The person posting the comment will be in sole ownership of its responsibility. According to the central government's IT rules, obscene or offensive statement made against a person, religion, community or nation is a punishable offense, and legal action would be taken against people who indulge in such activities.

Latest News

Not Good for India-Canada relations: Jaishankar slams Trudeau Govt for tableau depicting Indira Gandhi’s assassination

Not Good for India-Canada relations: Jaishankar slams Trudeau Govt for tableau depicting Indira Gandhi’s assassination

Maharashtra: Violence in Kolhapur over WhatsApp messages glorifying Aurangzeb and Tipu Sultan

Maharashtra: Violence in Kolhapur over WhatsApp messages glorifying Aurangzeb and Tipu Sultan

Wrestlers halt protest till June 15 after meeting Anurag Thakur; WFI Elections to be held by June 30

Wrestlers halt protest till June 15 after meeting Anurag Thakur; WFI Elections to be held by June 30

9 Years of Modi Govt: Towards the Goal of Affordable & Accessible Healthcare

9 Years of Modi Govt: Towards the Goal of Affordable & Accessible Healthcare

Auto Draft

Over 100 eminent citizens support inclusion of Savarkar and removal of Iqbal from DU’s political science syllabus

Loka Kerala Sabha: Controversy over CM Vijayan New York event, Oppn claims up to Rs 85 lakh charge to sit close to CM

Loka Kerala Sabha: Controversy over CM Vijayan New York event, Oppn claims up to Rs 85 lakh charge to sit close to CM

Meeting of Opposition leaders to be held in Patna on June 23: JDU president Lalan Singh

Meeting of Opposition leaders to be held in Patna on June 23: JDU president Lalan Singh

“Degree of trust, confidence that India, US have was not present a decade ago: Kurt Campbell

“Degree of trust, confidence that India, US have was not present a decade ago: Kurt Campbell

“Serbia emerged as film destination for Indian filmmakers”: President Droupadi Murmu

“Serbia emerged as film destination for Indian filmmakers”: President Droupadi Murmu

Education: New Horizons for Hindu Studies

Education: New Horizons for Hindu Studies

  • Privacy
  • Terms
  • Cookie Policy
  • Refund and Cancellation
  • Delivery and Shipping

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies

No Result
View All Result
  • Home
  • Bharat
  • World
  • Editorial
  • Analysis
  • Opinion
  • Defence
  • Culture
  • Sports
  • Business
  • RSS in News
  • My States
  • Vocal4Local
  • Special Report
  • Sci & Tech
  • Entertainment
  • Education
  • Books
  • Interviews
  • Travel
  • Health
  • Obituary
  • Podcast
  • Subscribe
  • Advertise
  • Circulation
  • Careers
  • About Us
  • Contact Us
  • Privacy Policy
  • Cookie Policy
  • Terms of Use
  • Refund and Cancellation

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies