Rajasthan: India's first high-speed railway trial track to be ready by October 2024
September 14, 2026
  • Read Ecopy
  • Circulation
  • Advertise
  • Careers
  • About Us
  • Contact Us
Android AppiPhone AppArattai
Organiser
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • World Hindu Congress 2026
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • World Hindu Congress 2026
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
Organiser
  • Home
  • Bharat
  • World
  • Operation Sindoor
  • Editorial
  • Analysis
  • Opinion
  • Culture
  • Defence
  • International Edition
  • RSS @ 100
  • Magazine
  • Read Ecopy
Home Bharat

Rajasthan: India’s first high-speed railway trial track to be ready by October 2024

According to a CPRO North Western Railway official, the first dedicated fast railway trial track in India is expected to open in the Didwana district of Rajasthan by October 2024

WEBDESKWEBDESK
Dec 23, 2023, 10:00 am IST
inBharat, Rajasthan
Follow on Google News
Work in progress for India's first high-speed railway trial track 

Work in progress for India's first high-speed railway trial track 

Facebook
Twitter
WhatsAppTelegramEmail

India’s first dedicated fast railway trial track is set to be ready by October 2024 in Rajasthan’s Didwana district, said CPRO North Western Railway (NWR) official on December 21. The project is intended to improve the country’s railway system testing facilities.

Indian Railways is soon going to realise the dream of the country’s first fast railway test track, work is in progress 24/7. Construction of the country’s first railway test track, being built on the lines of America, Australia and Germany, is underway near Navan City Railway Station in Didwana district of Rajasthan.

CPRO North Western Railway (NWR) Captain Shashi Kiran said, “The construction work of the country’s first railway test track in the Nawan of Jodhpur division has been started by the Railways. It is being built in the lines of tracks located in America, Australia and Germany. With its construction, the country will be able to provide testing facilities of international standard in the field of railways.”

Captain Shashi Kiran further said that the construction work of this approximately 60-kilometre-long railway test track being developed by the Jodhpur division of North-Western Railway has been started in a phased manner. This dedicated test track is likely to be ready by October 2024 at a cost of approximately Rs 819.90 crore.

CPRO NWR said that with the completion of this track project, India will be the first country to have comprehensive testing facilities as per international standards for rolling stock.

The country’s first high-speed train test track developed by the Research and Standards Organization (RDSO), the only research organisation to meet the technical needs of railways, is being built from Gudha-Thathana Mithri to Nawan railway station of Jodhpur division of North Western Railway.

“Complete procedure has been completed by the Railways to acquire the related land. Besides, more than half of the test track construction work has also been completed. It is noteworthy that the construction of this test track will be completed in two phases. In which the first phase will be 25 kilometers, under this, 95 per cent construction work of the Major Bridge has also been completed. Apart from this, 34 small bridges are also being constructed on this track for testing purposes,” Captain Shashi Kiran said.

Railways also plans to build workshops, laboratories and residences in the second phase of construction work. “This high-speed dedicated railway track will have a 23 km long main line, a high-speed 13 km long loop at Gudha, a 3 km quick testing loop at Nawan and a 20 km curve testing loop at Mithri,” he said.

Many types of new tests will be conducted on this world-class test track of railways. There will also be trials of high speed, Vande Bharat and regular trains on this. Apart from locomotives and coaches, this track will also be used for trials of high-axle load wagons. After the construction of this track, testing will be done to promote Duronto and high-speed trains in the country, which will enhance the progress of Indian Railways.

(with inputs from ANI)

 

 

 

 

Topics: RajasthanIndian RailwayTrial trackNorth Western Railway
Share
Tweet
SendShareSend
✮ Subscribe Organiser YouTube Channel. ✮
✮ Join Organiser's WhatsApp channel for Nationalist views beyond the news. ✮
Previous News

US: Hindu mandir wall defaced by anti-India graffiti, cops treating it as ‘hate crime’

Next News

Bihar: Women teachers video seeking change in school timings goes viral ; BJP asks CM Nitish Kumar to intervene

Related News

RSS Sarsanghchalak Dr Mohan Bhagwat, attended the 37th annual prize distribution ceremony ‘Swaraj’ at L.K. Singhania Education Centre

Education must go beyond livelihood and focus on holistic human development: Dr Mohan Bhagwat

The oil fields of Rajasthan

Rajasthan to rise crude oil output to 80K barrels per day; Thar desert emerges as India’s new energy security frontier

CJP’s agenda behind “school thik karo campaign” exposed; SC refuses PIL against curbs on filming inside govt schools

NTA to conduct AIAPGET 2026 re-exam in Jaipur after power disruption in the centre; Check date & key details here

Jaipur villagers reject Ashutosh Ranka’s BJP claim, saying they confronted CJP members to protect their local school

Rajasthan: Jaipur villagers reject CJP’s BJP link claim, say they chased away Ashutosh Ranka’s team to protect school

Rajendra Singh, popularly known as the 'Water Baba'

From Shovel to Streams: Why ‘Water Baba’ Rajendra Singh’s work still matters in an age of crisis

Load More

Latest News

Fact Check: Viral Video Falsely Claims PM Modi Said He Would End Poverty ‘In One Go’

FACT CHECK: Did PM Modi say he would end poverty in Bharat in one go? Viral video is clipped

At just 19, Mohammad Nabeel built an online Al-Qaeda network in UP

Al-Qaeda plot in UP: 19-year-old Mohammad Nabeel arrested over plan to recruit youths for Jihad

A representative image

Bankers Books Evidence Act 2026 to replace 1891 law from October 1: Here’s what will change?

SSC CGL exam Schedule (This is an AI generated image)

SSC CGL Tier 1 exams from September 30 to October 30; Check schedule and admit card details, vacancies

New Delhi, Sep 12 (ANI): Prime Minister Narendra Modi holds a bilateral meeting with Chinese President Xi Jinping on the sidelines of the BRICS Summit 2026, in New Delhi on Saturday. External Affairs Minister S. Jaishankar, NSA Ajit Doval and Principal Secretaries to the PM, Pramod Kumar Mishra and Shaktikanta Das also present. (@MEAIndia X/ANI Photo)

BRICS 2026: Why Putin, Xi and Pezeshkian meetings stand out in PM Modi’s diplomacy

Odisha Chief Minister Mohan Charan Majhi addresses the media at Bhubaneswar airport after returning from his UAE visit on September 13, 2026.

Odisha secures Rs 2.43 lakh crore investment proposals during CM Majhi’s five-day UAE outreach programme

Bhagwan Ganesh

Ganesh Chaturthi: Rationale behind worshipping Bhagwan Ganesh

RSS Akhil Bharatiya Sah-Bauddhik Shikshan Pramukh Deepak Vispute addressing the gathering

‘Nation First’ should be the guiding principle for every individual, regardless of their Field: Deepak Vispute

‘India was not poor; it was made poor’: The truth re-emerges through Jema Ferrer’s perspective

Six years after talent manager Disha Salian was found dead, her father Satish Salian on September 11 recorded a detailed statement with the Central Bureau of Investigation (CBI), naming Shiv Sena (UBT) leader Aaditya Thackeray, actors Dino Morea and Sooraj Pancholi, and others.

Disha Salian Murder Case: Father names Aaditya Thackeray in CBI statement; Lawyer claims gang rape, murder cover-up

Load More
  • Privacy
  • Terms
  • Cookie Policy
  • Refund and Cancellation
  • Delivery and Shipping

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies

  • Home
  • Search Organiser
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Africa
    • North America
    • South America
    • Europe
    • Australia
  • Editorial
  • Operation Sindoor
  • Opinion
  • Analysis
  • Defence
  • Culture
  • Sports
  • Business
  • RSS @ 100
  • Entertainment
  • More ..
    • Sci & Tech
    • Vocal4Local
    • Special Report
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Health
    • Politics
    • Law
    • Economy
    • Obituary
  • Subscribe Magazine
  • Read Ecopy
  • Advertise
  • Circulation
  • Careers
  • About Us
  • Contact Us
  • Policies & Terms
    • Privacy Policy
    • Cookie Policy
    • Refund and Cancellation
    • Terms of Use

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies