Nepal's largest hydropower project Arun III achieves major milestone with Indian Assistance
July 21, 2026
  • Read Ecopy
  • Circulation
  • Advertise
  • Careers
  • About Us
  • Contact Us
Android AppiPhone AppArattai
Organiser
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
Organiser
  • Home
  • Bharat
  • World
  • Operation Sindoor
  • Editorial
  • Analysis
  • Opinion
  • Culture
  • Defence
  • International Edition
  • RSS @ 100
  • Magazine
  • Read Ecopy
Home Bharat

Nepal’s largest hydropower project Arun III achieves major milestone with Indian Assistance

Nepal's Arun III hydropower project, constructed with Indian assistance, has reached a major milestone. PM Pushpa Kamal Dahal, alongside Indian Ambassador Naveen Srivastava, marked the breakthrough of the 11.8 km headrace tunnel

WEBDESKWEBDESK
Jun 6, 2024, 08:00 am IST
in Bharat, World, International Edition
Follow on Google News
Nepal's Arun III hydropower project

Nepal's Arun III hydropower project

FacebookTwitterWhatsAppTelegramEmail

The Arun III hydropower project in Nepal, which is being constructed with Indian assistance, marked its breakthrough. Nepali Prime Minister Pushpa Kamal Dahal in the presence of Indian Ambassador Naveen Srivastava triggered the last blast to mark the breakthrough of the 11.8 KM headrace tunnel of Nepal’s first export-oriented project.

The 900 MW hydropower project being constructed on the Arun River with a budget of about USD 1.4 billion, is a run-off-the-river type project whose construction started in May 2018.

The Satluj Jal Vidyut Nigam (SJVN) was awarded with the project through international competitive bidding in March 2008. The Investment Board Nepal and SJVN signed an agreement for the development of the Arun III project in November 2014.

In his address at the event, Nepal’s Prime Minister said that the breakthrough has brought Nepal and India closer to their goal of providing clean, renewable energy and contributing to the sustainable development of the region. He expressed his appreciation for the ongoing efforts and reaffirmed the government’s commitment to facilitating the timely completion of the Arun III project.

Indian Ambassador to Nepal, Naveen Srivastava, recalled the long-term power trade agreed upon between Prime Minister Narendra Modi, and his Nepali counterpart, for the import of electricity from Nepal last year.

The completion of the export-oriented 900 MW Arun III would be a major milestone for the agreement.

As of now, around 75 per cent of the project work has already been completed, and the remaining work is progressing in full swing. Along with this, the work on the 217 km-long associated transmission line is also in progress.

The largest hydropower project is expected to generate electricity next year, which has the potential to generate 3,924 million units of electricity every year. The SJVN is executing 2,200 MW of three hydroelectric projects in the Arun River basin, including a 679 MW Lower Arun Hydropower Project.

In July 2021, Nepal signed a USD 1.3 billion deal with SJVN to develop the 679MW Lower Arun, the second mega project undertaken by the southern neighbour after the USD 1.04 billion 900 MW Arun III.

The Lower Arun project will not have a reservoir or dam and will be a tailrace development of the Arun III project, which means water will re-enter the river for the Lower Arun project.
The Arun III was slated to start producing energy by 2020, but it didn’t happen as the financial closure deadline was pushed back by a year and a half.

According to the agreement, SJVN will provide 21.9 per cent of the monthly generated energy free of cost, which is expected to be equivalent to Rs 155 billion, and pay another Rs 107 billion in royalties over the next 25 years of its commercial operation.

The project is expected to provide direct economic benefits amounting to Rs 348 billion in the form of dividends, income tax, VAT, and customs, including the 21.9 energy and royalty, over the 25 years of commercial operation, after which the project’s ownership will be handed over to the Nepal government.

Arun III was conceptualised in the mid-1980s and redesigned in the nineties as a two-stage project of 201 MW each, planned for funding by a consortium of international donors led by the IDA of the World Bank.

However, the project fell into the backburner after the World Bank withdrew from the project due to criticism over multiple aspects of the project–its project design, implementation plan, and negative environmental impacts.

More than a decade later, the project was revived, with its installed capacity more than doubled from 402 MW to 900 MW.

(with inputs from ANI)

Topics: Arun IIISatluj Jal Vidyut NigamNepalPM Pushpa Kamal DahalHydropower project
Share16TweetSendShareSend
✮ Subscribe Organiser YouTube Channel. ✮
✮ Join Organiser's WhatsApp channel for Nationalist views beyond the news. ✮
Previous News

Breathe Easy: Ayurvedic secrets for Respiratory health

Next News

India’s FDI steady at USD 70.9 billion in FY24, inflows more than doubled in the construction sector

Related News

Yoga Day celebrations in Shanghai, China

International Yoga Day: Global celebrations echo the message of health, well-being and timeless ancient Indian wisdom

India’s UPI could soon power payments in South Africa

After Nepal, South Africa eyes India’s UPI model as global footprint expands

Chairman of the Rastriya Swatantra Party of Nepal Rabi Lamichhane meets PM Modi in New Delhi

From the China Card to Development Diplomacy: Nepal opens a new chapter in its political reset with India

Embassy of Nepal in India announced the rescue of 453 Nepali citizens from an alleged networking fraud operation in India's Kushinagar district

International job fraud racket busted in UP’s Kushinagar; 453 Nepali nationals rescued

Mastermind Saif-ul-Islam Arrested in MP with Counterfeit Currency

Fake currency racket busted in MP: Mastermind Saif-ul-Islam arrested with Rs 1.4; Pakistan-Nepal link Under Probe

Rashtriya Swatantra Party of Nepal(RSP)

The rise of Rashtriya Swatantra Party(RSP) & Balen Shah in Nepal: Its ambitious plan & the gap between vision & reality

Load More

Latest News

Punjab Pharma Officer Exam Cheating Racket Exposed: 35 detained, candidates allegedly paid up to Rs 13 lakh

(Left) Congress leader Mohammed Nalapad (Right) Karnataka Minister Priyank Kharge

RSS Defamation Case in Karnataka: Court orders personal appearance Of Priyank Kharge, Mohammed Nalapad

BMS hosts 15th BRICS Trade Union Forum (TUF) Summit 2026 in Hyderabad; Calls for worker-centric global order

BRICS TUF Summit 2026: Shifting the labour discourse

Courtesy: T.C. Rajesh’s FB post

Keralam: CPM’s Deshabhimani daily drops ‘Vijayan, the thief’ article from Sunday supplement; text Surfaces on FB

Self-immolation by Lobsang Palden in front of UN Headquarters in New York, (inset) the activist shortly before immolating himself

China and Tibet: Immolation of ‘Imposed Unity’

Authorities attacked during anti-encroachment drive in Shivajinagar

Anti-Encrochment Drive in Karnataka: Officials attacked in Shivajinagar; BJP slams govt’s appeasement politics

The Shadow of politics & radical ideologies behind NEET protests

AgriBio 2.0 aims to build a self-reliant, climate-resilient agricultural future through biotechnology

NITI Aayog’s AgriBio 2.0: How biotechnology and climate-resilient crops will transform Indian agriculture

(L) Jalaudheen Ustad with Dr. Arif Hussein Theruvath (R)

Keralam: Islamic scholar inaugurates Ex-Muslim event anonymously over security fears

Delhi's CJP protest allegedly shifted from student issues to political confrontation, overshadowing educational concerns

Delhi’s CJP Protest: How opposition collectives hijacked the movement and compromised students’ interests

Load More
  • Privacy
  • Terms
  • Cookie Policy
  • Refund and Cancellation
  • Delivery and Shipping

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies

  • Home
  • Search Organiser
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Africa
    • North America
    • South America
    • Europe
    • Australia
  • Editorial
  • Operation Sindoor
  • Opinion
  • Analysis
  • Defence
  • Culture
  • Sports
  • Business
  • RSS @ 100
  • Entertainment
  • More ..
    • Sci & Tech
    • Vocal4Local
    • Special Report
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Health
    • Politics
    • Law
    • Economy
    • Obituary
  • Subscribe Magazine
  • Read Ecopy
  • Advertise
  • Circulation
  • Careers
  • About Us
  • Contact Us
  • Policies & Terms
    • Privacy Policy
    • Cookie Policy
    • Refund and Cancellation
    • Terms of Use

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies