UP: Ganga expressway nears opening as FASTag toll trials succeed in Badaun
July 21, 2026
  • Read Ecopy
  • Circulation
  • Advertise
  • Careers
  • About Us
  • Contact Us
Android AppiPhone AppArattai
Organiser
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
  • ‌
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Europe
    • North America
    • South America
    • Africa
    • Australia
  • Editorial
  • International
  • Opinion
  • RSS @ 100
  • More
    • Op Sindoor
    • Analysis
    • Sports
    • Defence
    • Politics
    • Business
    • Economy
    • Culture
    • Special Report
    • Sci & Tech
    • Entertainment
    • G20
    • Azadi Ka Amrit Mahotsav
    • Vocal4Local
    • Web Stories
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Law
    • Health
    • Obituary
  • Subscribe
    • Subscribe Print Edition
    • Subscribe Ecopy
    • Read Ecopy
Organiser
  • Home
  • Bharat
  • World
  • Operation Sindoor
  • Editorial
  • Analysis
  • Opinion
  • Culture
  • Defence
  • International Edition
  • RSS @ 100
  • Magazine
  • Read Ecopy
Home Bharat

UP: Ganga expressway nears opening as FASTag toll trials succeed in Badaun

India’s longest expressway, the 594-km Ganga Expressway, is set to open to traffic next month after successful trials of its FASTag-enabled toll collection system in Uttar Pradesh’s Badaun district. Authorities say the project has entered its final readiness phase, with finishing works and system checks progressing simultaneously

WEBDESKWEBDESK
Jan 13, 2026, 12:00 pm IST
in Bharat, Uttar Pradesh
Follow on Google News
A representative image

A representative image

FacebookTwitterWhatsAppTelegramEmail

The Ganga Expressway, a flagship infrastructure project of the Uttar Pradesh government, has crossed a crucial milestone ahead of its expected inauguration next month. The expressway’s FASTag-based electronic toll collection system was successfully tested at a toll plaza in Badaun district, confirming the operational readiness of its contactless tolling infrastructure.

During the trial run, automatic boom barriers functioned smoothly, allowing vehicles to slow down and pass through without coming to a complete halt. FASTag scanners detected vehicle tags accurately, and toll payments were processed instantly, officials said, demonstrating seamless integration of the system.

According to reports, the successful test has strengthened expectations that the expressway will be opened to the public in the coming weeks.

The Uttar Pradesh Expressways Industrial Development Authority (UPEIDA), the nodal agency overseeing the project, said similar FASTag trials are being conducted at toll plazas across other construction packages of the expressway.

Officials noted that these parallel trials are aimed at ensuring uniform performance standards across the entire corridor before it is thrown open to traffic. Any technical issues detected during the tests are being addressed in real time, they added.

Senior state government officials said the expressway is in the final stages of completion, with last-mile works such as signage installation, safety audits, landscaping, and system integration progressing alongside tolling and surveillance checks.

Once operational, the six-lane, access-controlled Ganga Expressway will stretch over 594 kilometres, connecting Meerut in western Uttar Pradesh to Prayagraj in the east. The corridor passes through 12 districts, including Hapur, Bulandshahr, Amroha, Sambhal, Shahjahanpur, Hardoi, Unnao, Rae Bareli and Pratapgarh, significantly reducing travel time across the state.

Officials said the expressway is expected to boost regional connectivity, facilitate faster movement of goods and people, and support economic activity across agrarian and industrial belts along its route.

The scale of engineering involved in the Ganga Expressway is among the largest in India’s highway sector. The project spans 140 water bodies and incorporates an extensive network of bridges, flyovers, underpasses and culverts designed to ensure uninterrupted connectivity and minimal disruption to local traffic.

Infrastructure elements include seven road overbridges, 17 interchanges, 14 major bridges and 126 minor bridges. In addition, the expressway features 28 flyovers, 50 vehicle underpasses, 171 light vehicle underpasses, 160 small vehicle underpasses and as many as 946 culverts.

Officials said these structures have been planned to integrate the expressway with existing road networks while maintaining high-speed, access-controlled movement on the main carriageway.

The Uttar Pradesh government has partnered with Switzerland-based RTDT Laboratories AG and ETH Zurich University to deploy artificial intelligence and sensor-based systems for monitoring road quality and driving comfort.

Unlike conventional practices where surface quality is assessed after construction, the new system evaluates ride quality during the construction phase itself. This enables corrective measures to be taken immediately, improving long-term durability and safety.

A specially equipped Innova vehicle, fitted with vibration-based technology and seven accelerometer sensors, is being used to inspect all six lanes of the expressway in real time. The sensors measure surface undulations, elevation changes and ride comfort parameters, generating precise data for engineers.

Officials involved in the project said the AI-driven monitoring system ensures consistent construction quality across the length of the expressway. By identifying micro-level deviations in road surface smoothness, the technology helps maintain uniform driving conditions and enhances safety at high speeds.

The system is expected to be extended to other major projects, including the Gorakhpur Link Expressway, as part of the state’s broader push towards technology-driven infrastructure development.

With toll trials progressing successfully and construction nearing completion, authorities indicated that the Ganga Expressway is now in its final phase of readiness. Safety audits, emergency response planning and coordination with traffic and law enforcement agencies are also being undertaken ahead of the opening.

Once inaugurated, the Ganga Expressway is expected to emerge as a critical east–west corridor in Uttar Pradesh, setting new benchmarks in scale, technology and execution in India’s road infrastructure landscape.

Topics: Ganga ExpresswayFASTag Toll TrialUttar Pradesh ExpresswaysIndia’s Longest ExpresswayMeerut to Prayagraj
ShareTweetSendShareSend
✮ Subscribe Organiser YouTube Channel. ✮
✮ Join Organiser's WhatsApp channel for Nationalist views beyond the news. ✮
Previous News

Maharashtra: Election Commission halts Ladki Bahin scheme fund transfers ahead of civic polls

Next News

Kerala High Court raps SIT over Sabarimala gold loot, questions sparing of former Devaswom Board member KP Sankaradas

Related News

Ganga Expressway: India’s 594-km lifeline powering Uttar Pradesh’s rise to a USD1 trillion economy

IAF’s historic night landings on Ganga Expressway usher in new era of 24×7 combat readiness

Load More

Latest News

BMS hosts 15th BRICS Trade Union Forum (TUF) Summit 2026 in Hyderabad; Calls for worker-centric global order

BRICS TUF Summit 2026: Shifting the labour discourse

Courtesy: T.C. Rajesh’s FB post

Keralam: CPM’s Deshabhimani daily drops ‘Vijayan, the thief’ article from Sunday supplement; text Surfaces on FB

Self-immolation by Lobsang Palden in front of UN Headquarters in New York, (inset) the activist shortly before immolating himself

China and Tibet: Immolation of ‘Imposed Unity’

Authorities attacked during anti-encroachment drive in Shivajinagar

Anti-Encrochment Drive in Karnataka: Officials attacked in Shivajinagar; BJP slams govt’s appeasement politics

The Shadow of politics & radical ideologies behind NEET protests

AgriBio 2.0 aims to build a self-reliant, climate-resilient agricultural future through biotechnology

NITI Aayog’s AgriBio 2.0: How biotechnology and climate-resilient crops will transform Indian agriculture

(L) Jalaudheen Ustad with Dr. Arif Hussein Theruvath (R)

Keralam: Islamic scholar inaugurates Ex-Muslim event anonymously over security fears

Delhi's CJP protest allegedly shifted from student issues to political confrontation, overshadowing educational concerns

Delhi’s CJP Protest: How opposition collectives hijacked the movement and compromised students’ interests

ASTRA Missile

Saudi Arabia eyes India’s Astra Mk1 missile for F-15 fleet, boosting indigenous defence export prospects globally

AI Generated Image

Bharat Beyond Western Lens: How science, tech, education, defence & infrastructure progress are powering nation’s rise

Load More
  • Privacy
  • Terms
  • Cookie Policy
  • Refund and Cancellation
  • Delivery and Shipping

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies

  • Home
  • Search Organiser
  • Bharat
    • Assam
    • Bihar
    • Chhattisgarh
    • Jharkhand
    • Maharashtra
    • View All States
  • World
    • Asia
    • Africa
    • North America
    • South America
    • Europe
    • Australia
  • Editorial
  • Operation Sindoor
  • Opinion
  • Analysis
  • Defence
  • Culture
  • Sports
  • Business
  • RSS @ 100
  • Entertainment
  • More ..
    • Sci & Tech
    • Vocal4Local
    • Special Report
    • Education
    • Employment
    • Books
    • Interviews
    • Travel
    • Health
    • Politics
    • Law
    • Economy
    • Obituary
  • Subscribe Magazine
  • Read Ecopy
  • Advertise
  • Circulation
  • Careers
  • About Us
  • Contact Us
  • Policies & Terms
    • Privacy Policy
    • Cookie Policy
    • Refund and Cancellation
    • Terms of Use

© Bharat Prakashan (Delhi) Limited.
Tech-enabled by Ananthapuri Technologies